Product Description
The need for a seminar arose from the result of a 1987 survey, commissioned by the Department of Transport, which established that assessment and remedial work on bridges would cost around £700 million.
Speakers were drawn from Government departments, consulting engineers and testing firms.
The papers presented included:
- resource management
- research into assessment of concrete bridges
- the Northern Ireland experience
- current techniques for investigation, sampling and analysis of materials
- assessment of deteriorating prestressed concrete bridges
- reappraisal of substandard and deteriorating bridges
- assessment of prestressed concrete bridges as part of a highway improvement scheme
- towards a performance index for concrete bridges
- new strategies for bridge assessment
- responsibilities
Assessment of reinforced and prestressed concrete bridges (1988) collects together the papers presented at the seminar.
Speakers were drawn from Government departments, consulting engineers and testing firms.
The papers presented included:
- resource management
- research into assessment of concrete bridges
- the Northern Ireland experience
- current techniques for investigation, sampling and analysis of materials
- assessment of deteriorating prestressed concrete bridges
- reappraisal of substandard and deteriorating bridges
- assessment of prestressed concrete bridges as part of a highway improvement scheme
- towards a performance index for concrete bridges
- new strategies for bridge assessment
- responsibilities
Assessment of reinforced and prestressed concrete bridges (1988) collects together the papers presented at the seminar.
Additional Information
| Format | A4 |
|---|---|
| Number of pages | 49 |
| Publication date | September 1988 |
| Publisher | The Institution of Structural Engineers |


