CROSS: Rotting plywood decking on grandstand

Author: Confidential Reporting on Safer Structures

Date published

1 July 2022

Price
Free
Back to Previous

CROSS: Rotting plywood decking on grandstand

Tag
Author
Confidential Reporting on Safer Structures
Date published
1 July 2022
Price
Free
The Structural Engineer
Author

Confidential Reporting on Safer Structures

Citation

The Structural Engineer, Volume 100, Issue 7, 2022, Page(s) 18-19

Date published

1 July 2022

Author

Confidential Reporting on Safer Structures

Citation

The Structural Engineer, Volume 100, Issue 7, 2022, Page(s) 18-19

Price

Free

As the summer event season gets under way in the UK, we present a CROSS safety report highlighting the need for robust inspections of temporary demountable structures.

Additional information

Format:
PDF
Pages:
18-19
Publisher:
The Institution of Structural Engineers

Tags

Timber Temporary & Demountable Safety Professional Guidance Issue 7

Related Resources & Events

The Structural Engineer
Cross-laminated timber section of a building

CROSS Safety Report: The risk of collapse of multistorey CLT buildings during a fire

This month we present a report concerning multistorey cross-laminated timber buildings and their risk of collapse during a fire.

Date – 13 November 2023
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
CROSS logo

CROSS Safety Report: Water ingress to cross-laminated timber structural frame

This month's CROSS report concerns water ingress that caused parts of the cross-laminated timber (CLT) structural frame of an eight-year-old building to rot.

Date – 2 May 2023
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
New logo for Collaborative Reporting for Safer Structures

Collaborative Reporting for Safer Structures: CROSS-UK Newsletter 61

This month we highlight a report raising concerns about the fire safety of multistorey buildings comprising cross-laminated timber structures and the risk of collapse in the event of an uncontrolled fire.

Date – 4 May 2021
Author – Collaborative Reporting for Safer Structures
Price – £0