Author: Scott Brookes
31 March 2021
Standard: £10 + VAT Members/Subscribers: Free
Members/Subscribers, log in to access
Scott Brookes
The Structural Engineer, Volume 99, Issue 4, 2021, Page(s) 30-33
https://doi.org/10.56330/MFOA1730
DOI: https://doi.org/10.56330/MFOA1730
This article describes the seven-year project to restore and refurbish the Grade I listed Elizabeth Tower at the Palace of Westminster, London.
The first book to provide a complete guide to the conservation and maintenance of traditional architectural ironwork.
This article sets out typical structural issues encountered when dealing with churches and places of worship.