Recent Reconstruction of Locks and Control Structures on the River Great Ouse. Discussion on Mr. Os
Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Recent Reconstruction of Locks and Control Structures on the River Great Ouse. Discussion on Mr. Os

Tag
Author
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Citation

The Structural Engineer, Volume 18, Issue 10, 1940

Date published

N/A

Citation

The Structural Engineer, Volume 18, Issue 10, 1940

Price

Standard: £10 + VAT
Members/Subscribers: Free

THE PRESIDENT (Mr. P. J. Black, L.R.I.B.A.)presided.

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Opinion Issue 10

Related Resources & Events

The Structural Engineer
<h4>Foundations in Mandalay. Precis of a Report on An Investigation into the Subject of Foundations in t</h4>

Foundations in Mandalay. Precis of a Report on An Investigation into the Subject of Foundations in t

13. VERTICAL MOVEMENT UNDER TEST LOAD AND BUILDINGS. A study of levels taken on the tank and on the four indicator pegs (see Section 8) with one of the office post footing as datum, showed from the results available for twenty-five days slight cyclical variations in level.- Assuming that any relative vertical movement decreased with depth, and that any movement under a load was less than that on an unloaded area, i.e., movements entirely due to changes in moisture content, then the levels taken indicated with the loaded area as datum that: (a) on fine days, during the rains, there is a small relative rise of the soil surface of from 1/16 inch to 1/8 inch between 7.30 a.m. and 4.30 p.m., but no difference on a cloudy day; (b) after a period of rain the daily variation is at the minimum value of 1/16 inch, and throughout the day the surface is about 1/16 inch higher than on a fine day after a period of fine days. This difference on the second day increased to 1/8 inch, presumably as the excess moisture became absorbed lower down, giving rise to additional expansion. After a period of rain there seems to be a tendency for the surface to go on rising for four or five days until the excess moisture is absorbed in full. (see Table I.) F.L.D. Wooltorton

Price – £10
The Structural Engineer
Verulam pen

Verulam (readers' letters – May 2024)

This month's letters include discussion over design checks and suitably experienced engineers as well as seismic design of masonry and more.

Date – 1 May 2024
Author – Various
Price – £10
The Structural Engineer
FBI Evidence Response Team members work at the site of the Francis Scott Key Bridge collapse in Baltimore on March 26

Viewpoint: The Baltimore bridge collapse: a vital lesson for structural engineers

The tragedy of the Francis Scott Key Bridge highlights the need for structural engineers to ensure that the risks inherent in our built infrastructure remain acceptable, argues Colin Caprani.

Date – 1 May 2024
Author – Colin Caprani
Price – £10